Parapet Renovation on

Blackfriars Bridge

 

We worked as the Sub-consultant for Volkerstevin on Blackfriars bridge where we completed: investigative works, removal of existing balustrades, workshop, new casting, and installation of new castings.

When tasked with the refurbishment of the iconic bridge, we were unaware that the bridge was corroded and backfilled with concrete that had in-cased all fixings. This made this assembly virtually impossible and our method of works had to be reconfigured to over-come the problems this caused. Using our innovation we were able to overcome the numerous problems to achieve a successful conclusion to the project.

For further information on the iconic bridge, consult – .

Project Overview

Location:

Blackfriars Bridge, London

Client:

VolkerStevin Ltd

Services:

Parapet & balustrade restoration: castings, shot-blasting, painting, installation & removal.

 

Have a question or need a quote?

Contact us